Trail Evening on Ginny Trail at Bobcat Ridge

June 27, 2010 by bikekor

Repeats every 2 weeks until Wed Sep 01 2010 .
06:00 PM
06:00 PM
06:00 PM
06:00 PM

We will be starting pre-work on several projects on Ginny trail.  We plan to ride bikes up to the work site as much as possible, so bring a bike with you.  Some of the evenings will involve collecting rock and hauling materials to the work-sites in anticipation of a larger trail day to be scheduled.  Short projects that can be completed in the evening sessions will also take place.

1. close alternate line on rock half way up the trail
2. build rock armoring for water crossing near the bottom
3. replace natural log on lower log ride
4. add an additional log ride feature
5. fix trail slope and drainage problems in selected areas.